Current Projects

  • A rendering of a modern school campus with students and staff walking around the grounds.

    Knob Hill Elementary School Renovation Project

    Project Scope:

    • Modernization of existing buildings, site reconfiguration, and replacement of portable buildings with either portable or permanent buildings

     

    Budget: $94M – Measure Measure JJ logo

     

    Construction begins late Summer 2025

     

  • New Stadium Field

    Mission Hills High School Sitewide Athletic Improvement Project

     

    Project Scope:

    • Stadium: Replacement of artificial turf and replacement of synthetic track including the “D” area
    • Practice Field: Replacement of grass field with artificial turf and installation of field lights
    • Tennis Courts: Replacement of ten (10) tennis courts with eight (8) new post-tension concrete tennis courts and conversion of two (2) existing tennis courts into three (3) beach volleyball courts. New drainage of the surrounding slopes.

     

    Budget: $13.5M - Measure Measure JJ logo and CFD

     

    Construction began June 2025

  • An exterior view of a modern school building with the words 'Administration' above the entrance.

    Woodland Park Middle School Renovation Project (In design)

     

    Project Scope:

    • Modernization of existing buildings, site reconfiguration, and replacement of portable buildings with permanent buildings

     

    Budget: $105.2M - Measure Measure JJ logo and multiple funding sources

     

    Construction begins late fall 2025

  • Carrillo Elementary School arial photo of playground construction

    Carrillo Elementary School Drainage, Turf, and Asphalt Project

    Project Scope:

    • Removal and replacement of existing fields with artificial turf mounted on top of external drainage system
    • Installation of retention seat walls
    • Installation of shade structure
    • Removal and replacement of existing asphalt play areas with newly designed play area including ball walls, basketball standards, and tetherball poles

     

    Budget: $12.75M - Capital Facilities Redevelopment Fund and CFD

     

    Construction: February – August 2025

Knob Hill Elementary School

Knob Hill Elementary School Renovation Project

Project Scope:

  • Modernization of existing buildings, site reconfiguration, and replacement of portable buildings with permanent buildings

Budget: $94M  – Measure JJ

Construction began June 2025 for interium housing and grating

Carrillo Elementary School

  • Aerial photo of Carrillo Elementary School drainage project
    July 2025
  • Aerial photo of Carrillo Elementary School drainage project
    April 2025
  • Carrillo Elementary School
    August 2025

Carrillo Elementary School Drainage, Turf, and Asphalt Project

Project Scope:

  • Removal and replacement of existing fields with artificial turf mounted on top of external drainage system
  • Installation of retention seat walls
  • Installation of shade structure
  • Removal and replacement of existing asphalt play areas with newly designed play area including ball walls, basketball standards, and tetherball poles

 

Budget: $12.75M - Capital Facilities Redevelopment Fund and CFD

 

Construction: February – August 2025