Future
Measure JJ Future Projects
-
Paloma Elementary School Renovation Project (In design)
Project Scope:
- Renovation of existing buildings, site reconfiguration, and replacement of portable buildings with permanent buildings
Budget: $77.4M - Measure JJ and CFD Funds
Construction: In design
-
San Marcos High School Sitewide Athletic Improvements Project (In design)
Project Scope:
- Stadium: Replacement of artificial turf, including the “D” area. Replacement of synthetic track, shot put area, pole vault, and long jump runways.
- Practice Fields: Replacement of grass fields with artificial turf and installation of field lights.
- Beach Volleyball Courts: Addition of three (3) beach volleyball courts.
Budget: $7.0M - Measure JJ and CFD
Construction is scheduled to begin June 2026