Skip to main content

Future

Measure JJ Future Projects

  • An architectural rendering of Paloma Elementary School depicting a modern building with the words 'Multi-Purpose Building' and 'Administration' visible.

    Paloma Elementary School Renovation Project (In design)

     

    Project Scope:

    • Renovation of existing buildings, site reconfiguration, and replacement of portable buildings with permanent buildings

     

    Budget: $77.4M - Measure JJ and CFD Funds

    Construction: In design

  • Aerial view of San Marcos High School campus, including sports fields and buildings.

    San Marcos High School Sitewide Athletic Improvements Project (In design)

    Project Scope:

    • Stadium: Replacement of artificial turf, including the “D” area. Replacement of synthetic track, shot put area, pole vault, and long jump runways.
    • Practice Fields: Replacement of grass fields with artificial turf and installation of field lights.
    • Beach Volleyball Courts: Addition of three (3) beach volleyball courts.

     

    Budget: $7.0M - Measure JJ and CFD

    Construction is scheduled to begin June 2026