  • Knob Hill Renovation 
  • Mission Hills Sitewide Athletic Improvements 
  • Woodland Park Middle Renovation 
  • Transportation Yard Solar & EV Charging Stations Phase II

Mission Hills High School

Mission Hills High School Sitewide Athletic Improvements Project

Project Scope:

  • Stadium: Replacement of artificial turf and replacement of synthetic track including the “D” area
  • Practice Field: Replacement of grass field with artificial turf and installation of field lights
  • Tennis Courts: Replacement of ten (10) tennis courts with eight (8) new post-tension concrete tennis courts and conversion of two (2) existing tennis courts into three (3) beach volleyball courts. New drainage of the surrounding slopes.

Contractor: C.W. Driver

Budget: $13.5M - Measure JJ and CFD

Construction: Began June 2025

Knob Hill Elementary School

Construction Photos

Bldg E - Dec '25

Bldg E - Dec '25

Bldg B - Dec '25

Bldg B - Dec '25

Bldg C - Dec '25

Bldg C - Dec '25

Knob Hill Elementary School Renovation Project

Project Scope:

  • Renovation of existing buildings, site reconfiguration, and replacement of portable buildings with permanent buildings

Contractor: Balfour Beaty Construction Co.

Budget: $94M  – Measure JJ

Construction: Began June 2025 for interim housing and grating

Woodland Park Middle School

Construction Photos

 

Bldg H - Dec '25

Bldg H - Dec '25

Retaining Wall - Dec '25

Retaining Wall - Dec '25

Bldg H - Dec '25

Bldg H - Dec '25

Aerial 10-9-25

Aerial 10-9-25

Aerial 11-12-25

Aerial 11-12-25

Aerial 1-5-26

Aerial 1-5-26

Aerial 1-15-26

Aerial 1-15-26

Woodland Park Middle School Renovation 

Project Scope:

  • Renovation of existing buildings, site reconfiguration, and replacement of portable buildings with permanent buildings

Contractor: Lusardi Construction Co.

Budget: $105.2M - Measure JJ and multiple funding sources

Construction: Began September 26, 2025 for Phase I to include removal of portables 505/506, add temp power, and begin construction on Building H.

Transportation Yard Solar & EV Charging Stations Phase II

 

Project Scope: 

  • Installation of additonal solar power arrays and EV charging stations to promote sustainable transportation and reduce emissions for our electric bus fleet. Phase II

Contractor: Opterra Energy Services, LLC

Budget: $12.8 Million

Construction: Began October 2025

 

 

 

Construction Photos

Drilling holes for array B - Dec '25

Drilling holes for array B - Dec '25

Concrete pour for array D - Dec '25

Concrete pour for array D - Dec '25

Array C panels - Dec '25

Array C panels installed - Dec '25