San Marcos Middle New Building Project

San Marcos Middle School Administration OfficeSan Marcos Middle SchoolDigital Mock Up of Lunch AreaDigital Mock Up of the Entrance of the SchoolDigital Mock up of the Front of San Marcos MiddleGarden area of San Marcos Middle SchoolStairs in the New buildingLunch areaFront of building

The project consisted of three phases:  Interim Housing, gymnasium addition and construction of a new two story classroom building with associated site modifications.  The total new construction contained 25 teaching stations.

The new 2-story classroom building included twenty-four(24) teaching stations and the addition to the existing gymnasium has one (1) large classroom/fitness center.  In the existing plaza area there are site modifications to the lunch eating area near the MPR/kitchen 

A new trellis shade structure and monumental stair in front of the administration building entrance had been designed. The trellis provides shade to students waiting for pick-up, and to create a unifying architectural look to the main entrance.  Existing trees, brush and fences at the southeast corner of the Mission Road driveway are blocking desired views.  Dense vegetation and fences were removed, and replaced with plantings that will improve views to the school.   

Budget:
    Expenditures:  $21,545,945 (as of June 2019)

Project Status:
    100% Complete